Today’s Schedule;

8:30-12= Making split batons for the back of my new piece of work- had to chase Tim (plastic technician) to make sure this was definitely the best way to put up the work.

I ended up adding 2 more batons on the back than I normally would because the plastic is really flimsy, more support needed. Photos below;

12-1= tidied my studio space in preperation for my next piece- I want to make sure that nothing can scratch the surface of the plastic. Photo below;

51755187_264517084425748_3796037901754564608_n.jpg

1-1:30= lunch break

1:30-6=

  • organising Venice trip- opportunity to gather more photographs for artworks/ see exhibitions
  • the glue on the batons for my next piece needed time to dry so I could not start the application of sand yet
  • blog update
  • artist research/ organising contextual folder
  • drawing of Milan